Ivy Hollow - out of dry fit!

by brae  

I did a lot of prep work today, installed the sheet flooring, drilled holes where the wire channels meet the foundation and prepped the landscape board. I won't be attaching the house to the base until I get to the electrical shed and landscaping, just to make sure the building is in the right place. But, the board is prepped and primed with its felt feet on the bottom.

I have glued in three of the five walls! Wahoo! :D

I propped the remaining two in place to make sure the whole structure fits well.

6 comments

Comment from: Debora L. [Visitor]
Nice! Love the use of triangles!
10/21/19 @ 04:28
Comment from: Jodi [Visitor]
An exciting benchmark for sure! The end is in sight! Lovely floors!
10/21/19 @ 16:16
Comment from: Sheila [Visitor]
Yay! I'm so glad everything fit together well. Something about adding glue that seems to change that!
10/21/19 @ 16:53
Comment from: Kamelia [Visitor]
Looks absolutely great!
10/21/19 @ 18:24
Comment from: Samantha [Visitor]
Woot Woot! Such a cute little structure! :)
10/22/19 @ 00:15
Comment from: azteclady [Visitor]
w00t w00t!!!
10/23/19 @ 00:23


Form is loading...