Archives for: March 2010, 01
Master bath planning
by brae
While I had the second floor up during the dry build, I worked a bit on the layout of the rooms. The rooms will be from left to right: the guest bedroom (in the two story addition), the stairway, the master bath (which is technically shared with the gue… more »
Newport dry build
by brae
Since I am getting further along on the first floor, I decided to do a fresh dry build to see if there was anything I needed to address before attaching the second floor. I am still far from that part, but I figured it was better to know ahead of time.… more »









03/01/10 09:54:24 pm, 