Master bath planning

by brae Email

While I had the second floor up during the dry build, I worked a bit on the layout of the rooms.  The rooms will be from left to right: the guest bedroom (in the two story addition), the stairway, the master bath (which is technically shared with the gue… more »

Newport dry build

by brae Email

Since I am getting further along on the first floor, I decided to do a fresh dry build to see if there was anything I needed to address before attaching the second floor.  I am still far from that part, but I figured it was better to know ahead of time.… more »